IMMAX Engineering and Construction

GF B16 Lot 5 Estrella Homes Phase I, Sta Rosa II, Marilao, Bulacan, Marilao, 3019
IMMAX Engineering and Construction IMMAX Engineering and Construction is one of the popular Construction Company located in GF B16 Lot 5 Estrella Homes Phase I, Sta Rosa II, Marilao, Bulacan ,Marilao listed under Home improvement in Marilao , Engineering/construction in Marilao ,

Contact Details & Working Hours

More about IMMAX Engineering and Construction

YOUR ONE-STOP HOUSE CONSTRUCTION COMPANY!

Construction Design, Documentation and Estimate - Based on your proposed budget, we will develop a design concept that will suit your requirements. After the approval of the conceptual design, design detailing will follow which will include electrical, plumbing, structural and detailed architectural design. Bill of materials and detailed cost estimates will be prepared after the completion of detailed designs.
Building Permit Application - We will apply building permit and will prepare all required engineering documents including sign and seal of respective professionals. We guarantee our strict adherence to the national building code and safety guidelines in the Philippines.
Bank/Pagibig Loan Application - We will prepare all required technical documents for house construction bank loan or PAGIBIG loan.
Construction Management and Supervision - We will supply all labor, materials, equipments, tools, transportation, supervisions and other items necessary for satisfactory completion of the work, including taxes required by the government. A Project Engineer will be assigned to supervise the construction site on a full time basis. We will constantly coordinate with you with regards to the progress of works and any concerns that may arise during the construction period.
Water and Electricity Connection - We will process your application for permanent connection of water and electricity in the Philippines.
Warranty - We will repair at our own cost any defects, leakages or other faults which shall appear due to poor materials and workmanship within twelve (12) months from the date of completion and 15 years for the structural.

Map of IMMAX Engineering and Construction